Deterministic workflow
Best when steps, branches and system updates can be defined in advance and exceptions are limited.
Ask: can the route be specified before execution?Workflow architecture assessment · methodology draft 31 July 2026
Describe one real business process. The assessment evaluates predictability, contextual decisions, tool access, risk, approvals and evidence to identify the most appropriate operating architecture.
No percentage score. No automatic deployment promise. A transparent preliminary architecture signal.
The output is an architecture choice, not a maturity score
The assessment separates process stability from decision complexity and operational risk. A workflow can contain more than one model.
Best when steps, branches and system updates can be defined in advance and exceptions are limited.
Ask: can the route be specified before execution?Best when an agent must interpret context and choose tools while remaining inside a known operating graph.
Ask: does context change the next action?Best when the path may adapt across steps but actions require bounded authority, approvals, mission state and evidence.
Ask: must the system plan, replan or pause for control?Best when adaptive reasoning should hand validated actions to deterministic integrations or downstream workflows.
Ask: which parts should never be probabilistic?Step 1 · Architecture signal
Choose the closest description for the process as it operates today. The result is a preliminary design signal, not a readiness score or implementation guarantee.
Consider branches, exceptions and whether the sequence can be defined before execution.
Focus on the reasoning needed between receiving context and choosing the next action.
Use the highest material consequence created by tool use, data changes or external communication.
Preliminary architecture signal
The result will explain which operating model appears strongest and which boundary should be examined next.
What the full assessment examines
Which steps are stable, which require interpretation and where results may trigger replanning.
Which CRM, ERP, helpdesk, browser, voice, knowledge or API surfaces are required for execution.
Which actions may run freely, which require conditions or human approval and which should be explicitly denied.
Which decisions, tool calls, state changes and handoffs must remain observable and reviewable.
Lead magnet · design preview
The next assessment steps map the deterministic route, agent decisions, tool permissions, approval gates, evidence requirements and downstream integrations for one submitted process.
Delivery and sales handoff remain draft-only until the dedicated form, confirmation flow and privacy copy are operational.